Imperfections Charge 2022/23 and Reforecast Report 2021/2021 Decision Paper The Regulatory Authorities, in Northern Ireland and the Republic of Ireland, today publish the Imperfections Charge Decision paper. SONI and Eirgrid, together the Transmission System Operators (TSOs) for the all-island Single Electricity Market (SEM), control the transmission of electricity and the management of various network constraints. These network constraints create additional costs within the SEM, as the TSOs are required to allow for such constraints in real time and increase or decrease individual generator’s output of electricity to ensure the balance between supply and demand of electricity is maintained at all times. Constraint costs are recovered through the Imperfections Charge and this Decision paper details the Imperfections tariff to be applied in Tariff Year 2022/23. Responses to the Consultation paper (SEM-21-053) are attached as appendices and have been duly considered when making the decisions contained within this paper.
|
Documents
- SEM-22-045a Appendix 1 PrePayPower Response.pdf
- SEM-22-045b Appendix 2 Energia Response.pdf
- SEM-22-045c Appendix 3 SSE Response.pdf
- SEM-22-045d Appendix 4 Moyle Interconnector Response.pdf
- SEM-22-045e Appendix 5 FERA Response.pdf
- SEM-22-045f Appendix 6 TSOs Response.pdf
- SEM-22-045g Appendix 7 BGE Response.pdf
- SEM-22-045h Appendix 8 Power NI Response.pdf